Sign In | Join Free | My futurenowinc.com
China HEBEI SOOME PACKAGING MACHINERY CO.,LTD logo
HEBEI SOOME PACKAGING MACHINERY CO.,LTD
TO BE AND BE FOREVER!
Active Member

7 Years

Home > Thin Blade Slitter Scorer Machine >

1-4S Change Order 250m/min Speed BNC Inline Thin Blade Slitter Scorer Machine With Mutil-Screw Design

HEBEI SOOME PACKAGING MACHINERY CO.,LTD
Contact Now

1-4S Change Order 250m/min Speed BNC Inline Thin Blade Slitter Scorer Machine With Mutil-Screw Design

Brand Name : SOOME

Model Number : SMBD-BNC

Place of Origin : Hebei,China

Certification : CE

MOQ : 1

Price : $50000-$70000

Packaging Details : Plastic film or wooden case

Delivery Time : 30 Days

Payment Terms : T/T or L/C

Supply Ability : 30 set / month

Model : 1800/2200/2500

Scorer Height : 0-12mm

Motor Power : 25KW/32KW/35KW

Blade Scorer Adjustment : Computer Control

Min. Scorer Width : 0mm

Correction Rage : ±100mm

Speed : 200m/min 250m/min

Efficient Width : 1850mm/2250mm/2550mm

Contact Now

Product Description:

Product Overview

The Thin Blade Slitter Scorer Machine is a highly efficient and precise machine used in the corrugated cardboard industry. It is designed to slit and score corrugated cardboard sheets with precision and speed, making it an essential tool in any corrugated cardboard production line.

The machine comes in three different sizes to cater to various production needs. The Efficient Width options are 1850mm, 2250mm, and 2550mm, providing flexibility in production for different sizes of cardboard sheets.

The Motor Power of the machine is available in three options as well, with 25KW, 32KW, and 35KW, ensuring sufficient power to handle large volumes of corrugated cardboard sheets. This high-powered motor also contributes to the machine's efficiency and speed, making it a valuable addition to any production line.

The Blade Scorer Adjustment of the machine is controlled by a computer, allowing for precise and effortless adjustments to be made. This feature eliminates the need for manual adjustments, saving time and effort and ensuring consistent and accurate results.

The Model of the Thin Blade Slitter Scorer Machine is available in three sizes - 1800, 2200, and 2500. These different models cater to different production needs, providing options for companies of various sizes and production capabilities.

The Precision of the machine is an impressive ±0.5mm, making it a high-precision machine that delivers consistent and accurate slitting and scoring results. This precision is crucial in the production of high-quality corrugated cardboard sheets.

Key Features
  • Computer Control Slitting Scorer Machine
  • Servo Frequency Type Slitter Creaser Inline
  • Corrugated Slitter Scorer Machine Inline
  • Thin Blade Slitter Scorer
  • High Precision
  • Efficient Width: 1850mm/2250mm/2550mm
  • Motor Power: 25KW/32KW/35KW
  • Blade Scorer Adjustment: Computer Control
  • Model: 1800/2200/2500
  • Precision: ±0.5mm

In conclusion, the Thin Blade Slitter Scorer Machine is a versatile and efficient machine that is essential in the production of high-quality corrugated cardboard sheets. With its computer-controlled blade scorer adjustment, high precision, and various size and power options, it is a valuable investment for any company in the corrugated cardboard industry.

Features:

  • Product Name: BNC Thin Blade Slitter Scorer Machine
  • Efficient Width: 1850mm/2250mm/2550mm
  • Min. Scorer Width: 0mm
  • Model: 1800/2200/2500
  • Blade Size: 260*158mm
  • Name: BNC Thin Blade Slitter Scorer For Production Line
  • Servo Frequency Type Slitting And Creasing Machine
  • Corrugated Slitter Scorer Machine Inline
  • NC Thin Blade Slitting Scoring Machine

Technical Parameters:

Product Name BNC Thin Blade Slitter Scorer For Production Line
Model 1800/2200/2500
Efficient Width 1850mm/2250mm/2550mm
Speed 200m/min, 250m/min
Motor Power 25KW/32KW/35KW
Min. Slitting Size 135mm
Blade Size 260*158mm
Min. Scorer Width 0mm
Blade Scorer Adjustment Computer Control
Precision ±0.5mm

Applications:

BNC Thin Blade Slitter Scorer For Production Line
Brand Name: SOOME
Model Number: SMBD-BNC
Place of Origin: Hebei, China
Certification: CE

The BNC Thin Blade Slitter Scorer For Production Line, also known as the Servo Frequency Type Slitting And Creasing Machine, is a high-quality, efficient and economical inline slitter scorer machine. It is designed and produced by SOOME, a renowned manufacturer in Hebei, China, with CE certification, ensuring its superior quality and safety.

With a minimum order quantity of just 1 unit, this machine is suitable for both small and large scale production. It has a competitive price range of $50000-$70000, making it an affordable choice for businesses of all sizes. The packaging options include plastic film or wooden case, ensuring safe and secure transportation of the machine.

The delivery time for the BNC Thin Blade Slitter Scorer For Production Line is 30 days, allowing businesses to quickly incorporate this machine into their production line for improved efficiency and productivity. The payment terms include T/T or L/C, giving customers flexible options to choose from. With a supply ability of 30 sets per month, SOOME ensures timely delivery of the machines to meet the demands of their customers.

Product Features:
  • Speed: With a speed of 200m/min to 250m/min, the BNC Thin Blade Slitter Scorer For Production Line is designed for high-speed and efficient processing of materials.
  • Min. Scorer Width: This machine has a minimum scorer width of 0mm, ensuring precision and accuracy in scoring process.
  • Blade Size: The blade size of this machine measures 260*158mm, providing a sharp and clean cut for various materials.
  • Motor Power: The BNC Thin Blade Slitter Scorer For Production Line comes in three different motor power options: 25KW, 32KW, and 35KW, allowing businesses to choose the most suitable option according to their production needs.
Application and Scene:

The BNC Thin Blade Slitter Scorer For Production Line is widely used in the packaging industry for scoring and slitting various materials such as cardboard, corrugated board, and other paper-based materials. It can be used in a variety of production scenes, including but not limited to:

  • Cardboard box manufacturing factories
  • Corrugated board production plants
  • Paper packaging companies
  • Printing and packaging businesses
  • Customized packaging manufacturers

With its high-speed processing, precise scoring, and clean cuts, the BNC Thin Blade Slitter Scorer For Production Line is an essential machine for businesses in the packaging industry. Its efficient and economical design makes it a valuable addition to any production line, allowing businesses to meet the demands of their customers and improve their overall productivity. Choose SOOME's BNC Thin Blade Slitter Scorer to elevate your packaging game and stay ahead in the competitive market.

Customization:

Thin Blade Slitter Scorer Machine Customization Service
Brand Name: SOOME
Model Number: SMBD-BNC
Place of Origin: Hebei, China
Certification: CE
Minimum Order Quantity: 1
Price: $50000-$70000
Packaging Details: Plastic film or wooden case
Delivery Time: 30 Days
Payment Terms: T/T or L/C
Supply Ability: 30 set / month
Efficient Width: 1850mm/2250mm/2550mm
Correction Range: ±100mm
Blade Size: 260*158mm
Order Change Time: 1-4s (Servo Type)/3-8s (Frequency Type)
Precision: ±0.5mm

This Thin Blade Slitter Scorer Machine, branded as SOOME, model number SMBD-BNC, is a top-of-the-line product that is manufactured in Hebei, China and has obtained CE certification. It has a minimum order quantity of 1 and is priced at $50000-$70000. The packaging can be customized to either plastic film or wooden case, and the delivery time is 30 days. Payment can be done through T/T or L/C, and the supply ability is 30 sets per month.

This machine is available in three efficient widths: 1850mm, 2250mm, and 2550mm, and has a correction range of ±100mm. The blade size is 260*158mm, ensuring high precision cutting. With an order change time of 1-4 seconds for the servo type and 3-8 seconds for the frequency type, this machine is highly efficient and saves time.

Our Thin Blade Slitter Scorer Machine comes with the latest technology - Servo Frequency Type Slitter Creaser Inline, which allows for multi-screw slitting and scoring. The machine is also equipped with computer control, ensuring precision cutting and scoring. We understand the importance of customization, and our team is dedicated to providing tailor-made solutions to meet our customers' specific needs.

Choose our Thin Blade Slitter Scorer Machine for high efficiency, precision cutting, and customization options. Contact us now to place your order!

Packing and Shipping:

Packaging and Shipping of Thin Blade Slitter Scorer Machine

Our Thin Blade Slitter Scorer Machine is carefully packaged to ensure safe delivery to our customers. Each machine is wrapped in protective materials and placed in a sturdy wooden crate for added protection during shipping. The crate is then securely sealed and labeled with the necessary shipping information.

For international shipments, we work closely with our trusted logistics partners to ensure that our machines are shipped in compliance with all customs regulations. Our team takes great care in preparing all necessary documentation and paperwork to facilitate a smooth and timely delivery.

Upon arrival at the designated destination, our machines are unloaded and inspected to ensure that they have arrived in perfect condition. Any necessary assembly and installation instructions are included in the packaging for our customers' convenience.

We strive to provide the best possible shipping experience for our customers. In the rare case of any damage during shipping, we have a dedicated team available to assist with any necessary repairs or replacements.

Thank you for choosing our Thin Blade Slitter Scorer Machine. We hope it will exceed your expectations and provide reliable and efficient performance for your production needs.

FAQ:

  • Q: What is the brand name of this product?
  • A: The brand name of this product is SOOME.
  • Q: What is the model number of this product?
  • A: The model number of this product is SMBD-BNC.
  • Q: Where is this product manufactured?
  • A: This product is manufactured in Hebei, China.
  • Q: Is this product certified?
  • A: Yes, this product is certified with CE certification.
  • Q: What is the minimum order quantity for this product?
  • A: The minimum order quantity for this product is 1 set.
  • Q: How much does this product cost?
  • A: The price for this product ranges from $50000 to $70000.
  • Q: How is this product packaged?
  • A: This product is packaged with plastic film or wooden case.
  • Q: How long is the delivery time for this product?
  • A: The delivery time for this product is 30 days.
  • Q: What are the payment terms for this product?
  • A: The payment terms for this product are T/T or L/C.
  • Q: What is the supply ability for this product?
  • A: The supply ability for this product is 30 sets per month.
  • 1-4S Change Order 250m/min Speed BNC Inline Thin Blade Slitter Scorer Machine With Mutil-Screw Design1-4S Change Order 250m/min Speed BNC Inline Thin Blade Slitter Scorer Machine With Mutil-Screw Design

Product Tags:

Efficient Thin Blade Slitter Scorer Machine

      

Versatile Thin Blade Slitter Scorer Machine

      

Compact Slitter Scorer Machine

      
Wholesale 1-4S Change Order 250m/min Speed BNC Inline Thin Blade Slitter Scorer Machine With Mutil-Screw Design from china suppliers

1-4S Change Order 250m/min Speed BNC Inline Thin Blade Slitter Scorer Machine With Mutil-Screw Design Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: HEBEI SOOME PACKAGING MACHINERY CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)